Design Production – Sketch Design.pptx

Design Production – Sketch Design

1 / 33
volgende
Slide 1: Slide
newEditor

In deze les zitten 33 slides, met tekstslides.

Dit is niet oké

Onderdelen in deze les

Design Production – Sketch Design

Recap from last week

  • What did we look at last week?


Recap from last week

  • What did we look at last week?


  • Information used in the production of building designs.

Recap from last week

  • What did we look at last week?


  • Information used in the production of building designs.


  • Client Requirements

  • Site Constraints

  • Planning Constraints

  • Statutory Constraints

  • Environmental Constraints

  • Social Constraints

  • Economic Constraints

Intended Learning Outcomes

Client Requirements – building use

  • What the client is going to use the building for.

    • Residential - Houses

    • Commercial – Shops & Offices

    • Industrial – Factories & Warehouses

    • Retail – Shopping Centres & Supermarkets

    • Health – Hospitals & Medical Centres

    • Cultural - Cinemas, Theatres, Art Galleries & Museums

    • Recreation – Sports Centre & Spas

    • Educational – Schools & Colleges

    • Religious – Churches, Chapels & Mosques


  • The planning authorities will consider the use of the building carefully and look how this will impact the area. The planned development must operate within its defined use.


Client Requirements – project spatial requirements

  • Building Size and Layout

  • Circulation Space

  • Number of Floors

  • Number of Rooms


  • This information is vital to establish initial costs analysis and to identify suitable sites which could accommodate the project.


Client Requirements – flexibility and remodelling potential

  • The client may have their own ideas and vision of how the building should look.


  • Architects need to be able to work with the client to meet their needs while ensuring they maintain integrity of the building.

Client Requirements – external & internal aesthetics

  • How the building will look, its appearance, known as its aesthetics.


  • Some materials have better aesthetics than others.


  • Client might want open plan or more traditional style rooms.

Client Requirements – sustainability & energy efficiency

  • Among the most important considerations for clients are the energy costs and the possible incorporation of energy-efficient processes within the building.


  • Lifetime energy costs are major financial factor for a building so client may wish to incorporate new and innovative techniques to reduce these costs.


  • Any examples of Renewable Energy?

Client Requirements – sustainability & energy efficiency

Client Requirements – age demographic of the building user

  • It is important to consider the end user of the building i.e. the target market.


  • The requirements for student accommodation at a university will be different from the requirements of a retirement home, as older people are likely to have physical disabilities and to spend more time in their rooms.

Client Requirements – Needs of different building users

  • Legislation such as the Disability Discrimination Act 1995 and the Building Regulations ensure that buildings are accessible to all users, including wheelchair users and others with mobility issues.


  • Designers must also consider the implications of the building being used by specific groups, such as children, who not only need the facilities to be on a smaller scale but also must be kept safe and not harmed by anything relating to design.

Client Requirements – security requirements

  • The design and construction of secure and safe buildings is a key objective of any design team.


  • Fire Protection.

  • Health and Safety of the users.

  • Protection against natural hazards such as high winds and flooding.

  • Security of the building users and assets.

Introduction into Design Production

  • For a particular brief, given to a range of Architectural and Engineering companies, there could be a wide range of design solutions. It is possible that all these solutions would have satisfied the requirements of the brief by using:

  • A wide range of materials – both structural and non-structural

  • Various methods of construction – both traditional and modern

  • Different projects timescales

  • A range of project costings

Introduction – continued…

Today the whole of the design process should consider the following:

  • Reducing energy consumption

  • Local energy generation

  • Reducing water consumption

  • Recycling of ‘grey water’

  • The impact of the building on the environment

  • Using materials with low embodied energy

  • Specifying recycled and reused materials and components

  • Adaptability and reuse of the building (including disassembly)

Consider various options relating to Primary considerations:

  • Position and orientation of the building on the site

  • External appearance

  • Type of substructure – foundations and ground floor

  • Type of superstructure – walls, upper floors, and roof

  • Heating and ventilation


  • https://www.youtube.com/watch?v=k4dVgbuxBAw



Consider various options relating to Secondary considerations:

  • Doors

  • Windows

  • Fixtures and fittings

  • Landscaping


What is a sketch design?

Once the project is declared as being feasible, the design team will produce a design concept based on the brief.


This can include:

  • Ideas about the alternative methods of construction that could be used

  • Diagrams and sketches – initial ideas

  • A Summary of environmental issues

  • Sustainability – how ‘Green’ the building can be within the proposed budget

Once this outline of ideas is complete, the designer will focus on issues such as

  • The main materials to be used for construction

  • The location and orientation of the building within the site

  • The layout of spaces with the building

What will the designer do?

  • May include some photographs of similar buildings to illustrate the use of colour and texture of prosed materials.


  • Many clients find it difficult to define exactly what it is that they want.


  • The initial sketch designs usually help them to decide what they don’t want. Sketch designs can also be useful for preliminary discussions with planning control.

Early stages of the design process

  • The design process uses a range of different types of drawings. These include diagrams and sketches. The diagrams and sketches the designer makes in the early stages explore and evaluate alternative ideas and solutions. These are less precise than working drawings and meant to aid the actual construction work.

The Development of Sketches

  • The plans are developed further sketch plans, elevations sections and 3D views are produced to help the client visualise the design.

Bubble diagrams

  • They can represent the various spaces in a floor plan with rough sizes, relative positions and connections. It is composed of circles, arrows and labels. Each bubble represents a space inside or outside the building and has a label to describe it. This diagram helps the designer determine the relationship between the spaces. The arrows show the movement between these spaces.


https://www.youtube.com/watch?v=vmHoGicPQQQ

Bubble diagrams with consideration to orientation and sun path

  • A sun path diagram shows the position and movement of the sun relative to the proposed building.

Student Group Activity

  • In groups of 3 discuss and draw a bubble for the brief below relating to your site and present to the class your design proposal.


  • Client Brief:

    • Living/ Kitchen/ Dining Room

    • Bathroom

    • 3 Bedroom

    • Utility Room

    • Toilet

    • Hall

Portstewart Site


Newcastle Site


Whiteabbey Site


Slemish Site


AI Producing Sketches

Intended Learning Outcomes

Student Feedback – using posted notes

  • What did you enjoy about the class?

What didn’t you enjoy about the class?

Do you feel better equipped to carry out hand sketches?