We are moving to our new building 1st June 2026
We are moving to our new building 1st June 2026
Changes which have and are
taking place
Reception has moved to Hawthorn (in old gym) and this will be the reception for all visitors.
Larch 20 is now being used by the enrichment team with table tennis, X box and chat areas available for all students in Larch/Hawthorn.
Beech courtyard- From September- there will be benches and a coffee van with drinks, paninis, pizzas, sandwiches and cakes for students as well as the Lounge(canteen area ) in our new building.
Exams are taking place so there are a lot of room changes please check the app for your timetable
This week there will be a lot of activity with movers around taking desks and crates to our new building and moving items from Larch.
From 1st June access for students/staff
Entrance to the building
There are three entrances
Elm Park Road
Old Church Lane
Ridgeway- disabled access
Elm Park Entrance- New building
Entrance at Elm Park Road ( this entrance is the access that the builders are currently using- there will be a pathway and turnstiles inside of the college area)
Students in the following departments will mainly be timetabled here
Science
Engineering
Health and Social Care and Early Years
Business
Maths and English (there will also be classes timetabled in Hawthorn and Larch
Construction
Old Church Lane Entrance
Entrance at Old Church ( this entrance is between Hawthorn and Larch
Students in the following departments will mainly be timetabled here
Foundation
Creative
ICT
ESOL
Uniformed Services
Art
Accounting
Maths and English (there will be classes timetabled in new build)
Ridgeway Entrance
- for learners with disabilities
Entrance at Ridgeway ( this entrance is where outside Beech areas are
Students will access through the gate to Beech and then will enter the college through enrichment area (Larch 20).
From 1st June – after the holiday
We have our new building and teaching will be happening in the area
The building is in Blocks
Block A – Light Orange
Block B – Light green.
Timetables
A room number is in Block A – A007 – Ground Floor, A107- First Floor
B room number are in Block B- B107 – First Floor, B207- Second Floor
L room numbers are Larch
H room number are Hawthorn
Willow, Oak and Elm will be getting demolished over the summer and there is no access to the buildings from the 1st June, Sports hall, canteen area will not be there.
From 1st June – 1st September access for students/staff
For students with disabilities
Entrance to new college
1st June- Signage
The Lounge – new dining facility
Grab and Go Area with coffee machine
Longer counter
Entrance from Block A
Entrance from B block stairway
Bench seating for 120
The Lounge- what you need to know
Seats 140 people
Timings till end of term
Breakfast from 8.15am-9.45 (Free breakfasts 8.15am to 8.45am)
Morning Service
Break 11am to 11.30am
Lunch 12 noon to 2pm (hot food service)
Coffee Shop 8.45am to 3.30pm
The Lounge-
Menu- changes daily
GROUND FLOOR LAYOUT
HR &
Finance
Student Services
IT Classroom
Classroom
The
Lounge
Security
Counselling
FIRST FLOOR
HSC & EYE Staffroom
Classroom
IT
Classroom
IT Room
Engineering staff room
Classroom
Classroom
Meeting Room
Office
HSC Classroom
EYC
Classroom
HSC Classroom
Library/ Study Space
SECOND FLOOR
Science Team
staff room
Principalship
Classrom
IT classroom
IT classroom
Classroom
Classroom
Meeting room
Classroom
Physics classroom
Biology Lab
Biology Lab
THIRD FLOOR
Chemistry Lab
Chemistry Lab
Classroom
Classroom
Classroom
Office
Life Skills
Classroom
Classroom
Classroom
Maths team staffroom
Meeting Room
Classroom
Office
Further information
Further emails will be sent to you and parents on Wednesday 28th to give you an update on the build –
Email on Friday 30th June to remind you of the entrances and to check app
1st June – maps will be handed out to you and there will be support staff outside building to help you navigate around the college
Any Questions